Mobile water base with a capacity 3000 m³
Great hopes were attached to the deposits in the area of the “Kramarzówka” boreholes, due to the resource potential. Most of the work carried out there, aimed at stimulating the deposits, was carried out in the technology of “hydraulic fracturing”, ie high pressure, where the main carrier was water.
Exflo participated several times in the “Kramarzówka” projects, being responsible for collecting and transferring water to subsequent services. We performed all services successfully, in accordance with the technical requirements.
In one of the “Kramarzówka” projects, in 2015 our company created the largest in Poland, temporary water base in flexible tanks. We placed fifteen of our pillow tanks on the drilling site, each with a capacity of 200m³, which gave a total of 3000m³.